358 fence installation planning

A practical checklist for engineers, installers and project buyers. Confirm site-specific engineering before installation.

Request a quotation

Installation workflow

01 · Confirm layout

Review fence line, site survey, finished height, gates, corners and local codes.

02 · Check foundation design

Foundation dimensions, concrete grade and post embedment must be specified by the project engineer based on local soil and wind conditions.

03 · Position posts

Set post spacing from approved shop drawings; verify line, level and vertical alignment.

04 · Fix panels

Fit panels with the specified anti-tamper fixing system. Verify orientation: narrow slots run vertically.

05 · Inspect coating

Check visible finish and repair handling damage using an approved method suitable for the coating system.

06 · Handover

Verify fixing torque, clearance, alignment, gates and project documentation.

This is a planning guide, not a structural design or certified installation instruction. Ask for project-specific drawings and engineering review.